乐筑天下

搜索
欢迎各位开发者和用户入驻本平台 尊重版权,从我做起,拒绝盗版,拒绝倒卖 签到、发布资源、邀请好友注册,可以获得银币 请注意保管好自己的密码,避免账户资金被盗
查看: 20|回复: 0

[综合讨论] To Link or to Workset?

[复制链接]

11

主题

968

帖子

919

银币

初露锋芒

Rank: 3Rank: 3Rank: 3

铜币
99
发表于 2022-7-8 21:15:00 | 显示全部楼层 |阅读模式
We're in the process of starting to use Revit for construction documents (Architecture). We've been using it for some years to develop our 3D models for presentation, but now we're attempting taking it further.
 
The "problem" is that the test project is rather large. Some 10 conjoined buildings varying from 3 floors to 20. After asking our reseller for advice we're running into some huge lists of (IMO) extra work. The reseller's experience is mostly as Structural so I take whatever he's saying with a grain (make that a truck-load) of salt. AFAIKT the "reasoning" behind his idea is that worksets could easily become non-usable if some dimwit checked it out, but not released it back.
 
His advice is to stay away from worksets as far as possible and rather split the files into separate construction portions (i.e. one for structure, one for finishes, one for windows, doors, etc.). This means of course that openings and junctions don't happen automatically. Each needs to be physically drawn in each of these files, aligned & locked to the relevant source3 of such in the other linked-in files.
 
Now if we had this in worksets the openings & joints would happen auto"magically". My point is this is one of the major reasons for using Revit instead of 2D CAD.
 
IMO I'd have split the entire project into building portions ... on the mojement joint lines. Then had worksets for each to split it further into stuff like facade, BOH areas, FOH areas, etc.
 
So I'm asking any architects if they have any suggestions as to how they prefer doing this type of large(ish) project. What pros & cons they've run into.
 
To me the issue of the checking-out-and-releasing being a major problem sounds a bit iffy. What's the difference there between someone (say) copying a RVT file for working at home and then overwriting the office copy the next day - only to thus delete whatever someone else did last night? I'd rather have a warning than nothing.
回复

使用道具 举报

发表回复

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

  • 微信公众平台

  • 扫描访问手机版

  • 点击图片下载手机App

QQ|关于我们|小黑屋|乐筑天下 繁体中文

GMT+8, 2024-11-22 00:01 , Processed in 0.148582 second(s), 54 queries .

© 2020-2024 乐筑天下

联系客服 关注微信 帮助中心 下载APP 返回顶部 返回列表